Marina del Rey, CA

Firestone Walker Rooftop Leak

Build To Last investigated an active rooftop leak at the Firestone Walker Brewery property in Marina del Rey, identifying multiple sources of water intrusion affecting both the roof system and the commercial space below.
The investigation documented deteriorated roofing materials, failed pipe penetrations, damaged flashing, and other conditions contributing to ongoing water intrusion. Both the rooftop and the interior ceiling areas were evaluated to trace the source of the leak and assess the extent of the damage.
A thorough inspection of the roof assembly and affected interior spaces provided a clear understanding of how moisture was entering the building. Detailed documentation of the existing conditions helped establish the scope of repairs needed to restore the roofing system and prevent future water intrusion.
By identifying the root cause before repairs began, the project provided the information needed to develop an effective repair strategy while helping protect the commercial space from continued damage.

Project facts

Work
Commercial rooftop leak investigation and repair
Location
Marina del Rey, CA
Year
2025
Start a Project

Have a build you want done right?

Tell us what you have in mind. We respond within one business day.